1. Project Background
Customer Requirements: A well-known electric bicycle company needs to build a smart logistics warehouse to meet the following requirements:
Storage Requirements: Over 1,500 SKUs (including whole vehicles, batteries, and accessories), supporting storage of whole vehicles (dimensions 1.8m × 1.2m × 0.8m, weight 50-100kg) and spare parts;
Efficiency Goals: Average daily order processing of 8,000 orders, with a peak throughput of 20,000 units per day;
Compliance Requirements: The battery storage area must be explosion-proof and fire-resistant (compliant with UN38.3 standards), with a fully integrated fire protection system across the entire facility;
Cost Optimization: Reduce reliance on manual labor and lower the goods damage rate to below 0.3%.